Five researched projects: one verified prime-prequalification deadline, one document-update lead, two planning forecasts and one stale listing flagged for exclusion. Estimates describe total project construction, not available subcontract value. Latest planroom addenda have not been exhaustively reviewed.
Prequalification · act nowUCLA · Cogeneration Plant New Electric Chiller
943904.01 · Estimated construction: $29,175,806
Source facts
A new electric centrifugal chiller, cooling tower, pumps, electrical work, distributed-control integration and commissioning. Prime prequalification is due November 5, 2026 at 2:00 PM through UCLA Planroom; the notice requires a B license.
Technical interpretation
Strong fit for central-plant mechanical, controls and equipment teams. This deadline is for prime qualification, not a subcontract quote.
Next action
Eligible primes should review the questionnaire now. Specialists should track qualified teams and package release; no subcontract opening has been verified.
Open official evidence ↗Advertisement pp. 1–2 · Documents available October 21, 2026
Reviewed October 27, 2026 · Check addenda before acting.
Document update · verify eligibilityLynwood · Abbott Elementary HVAC replacement
03MOT27 · DSA 03-126114
Source facts
The district lists the HVAC replacement, a prequalified-contractor list issued October 20 and Addendum 001 issued October 26, 2026.
Technical interpretation
A useful subcontractor research lead. Deadline, equipment quantities and purchasing responsibility are not verified in the accessible district index.
Next action
Open the district documents and prequalified list. Confirm the latest deadline and scope before quoting; do not assume new prime qualification remains available.
Open official evidence ↗District bid index · updated documents through October 26, 2026
Reviewed October 27, 2026 · Check addenda before acting.
Forecast · reconfirm releaseLA Harbor College · Campus hydronic replacement
February forecast: $10M–$30M · Design-bid-build
Source facts
The February 2026 forecast targeted Q4 2026 advertising for replacement heating and cooling distribution piping. IDS Group is listed as designer.
Technical interpretation
Relevant to hydronic contractors and insulation suppliers. The forecast is eight months old; current release and award status remain unverified.
Next action
Check BuildLACCD / PlanetBids for the named package and current documents before treating it as an active bid.
Open official evidence ↗February 2026 forecast · page 1
Reviewed October 27, 2026 · Check addenda before acting.
Forecast · early watchWest LA College · Cooling tower and ice storage
February forecast: under $10M · Design-build
Source facts
The February 2026 report targeted Q1 2027 advertising for central-plant cooling-tower replacement and ice-storage upgrades.
Technical interpretation
Potential fit for tower, thermal-storage and controls specialists. Equipment schedules and current procurement timing require confirmation.
Next action
Monitor the official procurement channel for a design-build qualification package and subsequent technical requirements.
Open official evidence ↗February 2026 forecast · page 2
Reviewed October 27, 2026 · Check addenda before acting.
Past deadline · do not bid from this noticeUCLA · Wasserman booster chiller
35399-CP1513 · Estimated construction: $600,000
Source facts
The linked advertisement sets July 28, 2026 as the bid deadline despite the project remaining on the current-bidding index. Scope includes a water-cooled chiller, pumps and AHU coil work.
Technical interpretation
Useful as an award-status research item only. A current index entry does not prove bidding is open.
Next action
Check awards and later addenda before any pursuit. No extension or reopening was verified.
Open official evidence ↗Advertisement pp. 1–2 · original deadline July 28, 2026
Reviewed October 27, 2026 · Check addenda before acting.